Logistic centre
Attignat, France - 2015
Project:Mutual logistics - logistic centre
Installation site:
Attignat, France
Production year:
2015
Scope of delivery:
six insulated coolers of the series TIA
Cooling capacity:
1.000 kW
Special characteristics:
installation on the outside wall of the logistic building, natural refrigerant ammonia