Logistic centre

Attignat, France - 2015

Project:
Mutual logistics - logistic centre
 
Installation site:
Attignat, France

Production year:
2015
 
Scope of delivery:
six insulated coolers of the series TIA

Cooling capacity:
1.000 kW

Special characteristics:
installation on the outside wall of the logistic building, natural refrigerant ammonia