E.ON Power-to-Gas project

Falkenhagen, Germany - 2013

Project:
E.ON Power-to-Gas test project
 
Installation site:
Falkenhagen, Germany

Production year:
2013
 
Scope of delivery:
seven dry coolers of series TDH
 
Dry cooling capacity:
approx. 800 kW
 
Special characteristics:
In cooperation with the Swissgas AG, the leading German energy group E.ON tests the energy of the future. Within one year, the system shall produce 8 million kWh of gas. This corresponds to an approx. gas consumption of 400 family houses. Due to special sound specifications, the units are equipped with silent-running EC fans.
 
read article