Paracelsus Klinik

Reichenbach, Germany - 2014

Project:
Paracelsus Klinik
 
Installation site:
Reichenbach, Germany

Production year:
2014
 
Scope of delivery:
one dry cooler of the series TDD
 
Dry cooling capacity:
approx. 145 kW
 
Special characteristics:
The waste-heat of a biogas plant operated there is fed through a district heating pipe to the refrigeration system. With it, not only the dry cooling demand of the biogas plant can be reduced significantly, also the hospital reaches a considerable increase of the energy efficiency. The equipping of the unit with EC fans and vibration dampers ensures a particularly low-noise operation, which is essential due to the direct location next to the hospital.