REWE, logistic centre

Buttenheim, Germany - 2016

Project:
REWE Buttenheim, logistic centre
 
Installation site:
Buttenheim, Gemany

Production year:
2016
 
Scope of delivery:
two hybrid dry coolers of teh series THACD
 
Capacity:

approx. 1.180 kW
 
Special characteristics:

integrated desuperheater circuit for precooling